Sunday, June 9, 2013

Another week, some more progress...

 Lots going on this week at the house.  The kitchen's electrical was run and all the junction boxes and all that stuff are in. The recessed lights are installed in the kitchen.  This was terribly exciting to see, but  once they got the dry wall up, the kitchen was much much better.  It feels so much cleaner in the kitchen now with out all the exposed walls and insulation!  We still have plywood flooring, but I think that is suppose to change this week. I can't wait to see the new floor!
Walls,  then flooring, then cabinets!  We are getting closer!
 The Back 1/2  wall is where the new stove is going to be.  The electric line hanging down is for the new exhaust hood.

Len is cooking dinner!  

Our bathroom is very, very close to being done!  So far I love it! The counter top is so nice and so easy to clean.    We had a small issue with them not recessing the medicine cabinets, but the contractor went back and fixed them.  If they aren't recessed, the lights above them look ridiculous!    My only other issue is the color of the outlets and switches.  I want them  white, and they are the same color as our old bathroom, but we'll fix them later.  If we asked them to change them all now, the electrician would have to come back and that would cost us a lot more!  The only things left to do are to touch up the paint, and put up the hardware, such as the towel bars and toilet paper holder.  And then... that room will be finished!  


No comments:

Post a Comment